IICRC CertifiedCert #70268689, S500 and S520 standards
Owner-Led ServiceOwner meets your adjuster on site We wrote about how grease fire smoke travels three floors in more detail.
Direct Insurance BillingAll carriers, every policy on the loss
24/7 Dispatch60 minute response across Boston
Why Is Triple Decker Restoration a Different Job From Single-Family Work?
Triple decker restoration, also searched as three family home restoration, is the mitigation, cleanup, and rebuild of Boston’s classic three-family homes, handled as one structure with three households inside it. The building is restored as a whole, because its framing, plumbing, and roof are shared, while the claim is managed unit by unit, because the policies are not. Getting both halves right is the entire specialty.
These buildings went up by the thousands between the 1880s and the 1920s across Dorchester, Roxbury, Mattapan, and Hyde Park, built to a pattern: three stacked flats, a common front stair, a rear porch system, and one vertical run of pipes feeding three kitchens and three baths. Consequently, a failure anywhere in that frame becomes a building-wide event within hours, and a crew that treats a triple-decker like a large colonial dries the unit it can see and misses the two it cannot.
There is also a human layout to manage. Most of these buildings are owner-occupied on one floor with tenants above or below, so the person filing the claim is often living inside the loss. Therefore our first hour on site covers all three units, and our documentation separates building damage from unit damage from the start.
Studio 24 Restoration Group staffs this work with triple decker contractors who know the stock: where the chases run, how the cavities connect, and which walls still hide knob-and-tube. As a result, three family home restoration here starts with the building’s anatomy.
Active loss in your triple-decker right now? Shut the main valve in the basement and keep everyone out of rooms with sagging ceilings, then call (781) 390-9855. We dispatch to multi-family losses 24/7, typically within the hour.
The number that matters: one triple-decker loss can involve up to four policies at once, the building owner’s policy plus a renters policy in each tenant unit. Each one needs its own documentation from day one.
Balloon Framing, Stacked Plumbing, and How Damage Moves Through a Three Family Home
Balloon framing means the wall studs run continuous from the sill to the attic plate, with no horizontal breaks at each floor. Modern platform framing caps every story; a triple-decker built in 1905 does not. Each stud bay is an open shaft three stories tall, and anything that enters it, water, smoke, or flame, can travel the full height of the building without ever crossing a hallway.
The plumbing follows the same vertical logic: one stacked chase carries supply and waste lines past three kitchens and three bathrooms, so a corroded fitting on the third floor discharges into a shaft that touches every unit below. Meanwhile, party-wall and shared-attic dynamics work sideways and up, since one open attic spans all three units and row-set buildings share side walls with the neighbor. Around those cavities sit the materials that define the stock, each with its own behavior.
Continuous Stud Cavities
Sill-to-attic bays act as chimneys for fire and downspouts for water. Every scope starts by mapping which bays the loss entered.
Horsehair Plaster on Lath
Meters wet long after the surface feels dry. We dry it in place where the keys hold, since replacement never matches a 1910 wall.
Knob-and-Tube Remnants
Live or abandoned runs still sit inside many cavities. Any wall we open gets its wiring assessed before it closes back up.
Flat Rubber Roofs
EPDM membranes over the shared attic fail at seams and drains, so one roof leak is never one unit’s problem.
One Loss, Three Units: How Do Triple Decker Insurance Claims Actually Work?
One loss in a triple-decker can trigger up to four claims: the building owner’s policy for the structure, and a renters policy in each tenant unit for that household’s belongings and displacement costs. The structure, from framing and plaster to the roof and common stairs, belongs on the owner’s claim; each tenant’s furniture, clothing, and hotel receipts belong on that tenant’s own policy. This is general guidance and policy language varies, but the division of labor is consistent enough to plan around.
Who documents what decides who gets paid. The owner needs a building scope, each tenant needs a contents inventory, and everyone needs the cause of loss established once, professionally, before the evidence is disturbed. Studio 24 builds that file as one package: unit-by-unit moisture maps, photos keyed to floors, and an Xactimate scope that separates building line items from contents so four adjusters can each find their piece. Additionally, our insurance claims team coordinates the carriers so the owner is not translating between three households and four claim numbers alone.
The owner-occupant landlord carries the strangest version of this: claimant for the structure, landlord for the families upstairs, and sometimes a displaced resident, all in the same week. Studio 24 was founded by Ansy Chevalier, an IICRC certified restorer, cert #70268689, who meets adjusters at the building personally. As Ansy puts it, “In a triple decker, the unit you can see is never the whole loss. We meter all three floors because the building is one structure wearing three addresses.”
Here is the pattern that proves the point. A supply line lets go on the third floor on a February night, the kind of freeze the January 2018 cold snap produced citywide, and by morning the building holds three losses that need three files.
| Floor | What happens there | What must be documented |
|---|---|---|
| Third floor (source unit) | The burst floods the kitchen, and standing water finds the stud bays and plumbing chase within minutes | Cause of loss with the failed fitting preserved, extraction records, the tenant’s contents inventory, full moisture map |
| Second floor (middle unit) | Water descends inside the cavities behind the plaster, so the unit looks untouched while its walls saturate from within | Cavity meter readings and thermal imaging, logged daily, because visible-damage photos alone read as no damage at all |
| First floor | Ceilings stain and sag as the cavities drain, fixtures collect water, and plaster keys shear under the weight | Ceiling moisture readings, electrical safety checks, contents photographed before they move, sag measured over time |
| Basement and structure | Water pools on the sill atop the fieldstone foundation, wetting the base of every stud bay it passed through | Sill and framing readings on the owner’s structural claim, plus the drying log proving the frame reached dry standard |
Notice where the fight usually happens: the middle unit. An adjuster sees a wet third floor and a stained first-floor ceiling, and the second floor reads as fine because its damage is inside the walls. Unless cavity readings enter the file early, that saturation gets discovered months later as mold, and the coverage argument starts. Documenting the middle unit on day one is the highest-value hour in a triple-decker claim.
The Landlord Policy Myth, and Who Pays When Tenants Are Displaced
Displacement money flows through three different doors, and mixing them up is how owners end up paying out of pocket. Speaking generally, since policies differ: an owner-occupant displaced from their own unit typically looks to additional living expense coverage on their own policy, rent lost from uninhabitable tenant units typically falls under the owner’s fair rental value or loss-of-rents coverage, and the tenants’ own hotel nights run through loss-of-use coverage on their renters policies, not through the landlord.
Consequently, the fastest way to shorten everyone’s displacement is not paperwork at all. It is restoring habitability floor by floor, which is why we sequence drying and rebuild to hand units back one at a time instead of holding the building hostage to the worst floor.
“The landlord’s policy covers everything in the building, so the tenants just wait for the owner’s claim to pay for their stuff and their hotel.”
The owner’s policy covers the structure, not tenant belongings. A tenant without a renters policy usually has no coverage for ruined furniture or displacement costs, and the owner’s carrier will not pick that up. Every household on the loss needs its own claim, opened early, with its own documentation.
- Building scope on the owner’s claim
- Contents on each tenant’s own policy
- Units handed back floor by floor
- All carriers billed directly by us
Triple Decker Water Damage in Boston and the Middle Unit Problem
Triple decker water damage behaves vertically. Whatever escapes on an upper floor rides the open stud bays and the plumbing chase downward, wetting plaster from behind on every level it passes. The source unit shows the mess, the bottom unit shows the stains, and the middle unit hides its share inside the walls, which is why it needs metering before it needs paint.
The winter version is the one we run most. Freeze-thaw cycles split pipes in the uninsulated back hallways and unheated basements these buildings were born with, and a single cold snap fills our board from Dorchester to Hyde Park overnight. When that happens in a three-family, our burst pipe damage crews extract in every affected unit the same night, then open the base of each wet stud bay so the cavity can actually dry. Afterward, the loss folds into the full water damage restoration process: metered drying to IICRC S500 targets, logged daily, unit by unit.
Left undocumented, hidden cavity moisture has a second act. The EPA notes mold can begin growing on damp materials within 24 to 48 hours, and a saturated bay behind sound-looking plaster is a textbook starting point. However, if a musty odor is already climbing the back stairs, our mold remediation team scopes the cavities under S520 containment instead.
- Hour 0 to 1: All three units, not oneCrew arrives within the hour, source stopped, every unit accessed and walked.
- Hour 1 to 4: Extraction and cavity mappingWater extracted on every floor, stud bays and chases traced with thermal imaging and meters.
- Day 1: The unit-by-unit file opensMoisture maps, photos, and contents notes separated by floor for each policy on the loss.
- Days 1 to 5: Monitored drying, all floorsLGR and cavity drying to S500 dry standard, readings logged for every unit, including the quiet middle one.
- Day 5 onward: Floor-by-floor handbackUnits restored to habitability in sequence, rebuild scoped on the same claim file.
Triple Decker Fire Damage Repair: One Unit Burns, Three Units Suffer
Fire in a balloon-framed building has a highway. Flames that enter a stud bay on the first floor can reach the shared attic without ever showing themselves in the second-floor rooms, which is why Boston fire crews open walls so aggressively in these buildings. The smoke needs even less help. Pressurized by heat, it rides the same cavities and the common stairwell into units the fire never touched, and it settles into horsehair plaster, which absorbs odor the way it absorbs water. Multi-family buildings carry real exposure here: according to NFPA home structure fire data, apartments and other multi-family homes account for roughly a quarter of US home structure fires each year.
Restoring that loss means running two scopes at once. The burned unit follows the full fire damage restoration sequence: board-up, structural assessment, soot removal, and rebuild. Meanwhile, the unburned units need their own documented treatment, because a tenant two floors from the flames still has smoke-saturated contents and a claim of their own. Our smoke damage cleanup crews treat those units with HEPA air scrubbers and hydroxyl generators, and we test surfaces in every unit rather than assuming distance equals clean. In our experience, the third-floor tenant above a first-floor kitchen fire often files the larger contents claim, precisely because heat and smoke rise through everything this building was framed with.
Multi-Family Restoration Services: Rebuilding Three Units Under One Roof
The rebuild is where a triple-decker either comes back as the building it was or comes back as three mismatched apartments. Finishes have to carry across units: the stair hall trim, the five-panel doors, the plaster walls with their original profiles. We record profiles from surviving rooms and reproduce them in the damaged ones, so the second-floor unit does not read as the renovated one when the owner re-rents it. Since the same team ran the mitigation, our reconstruction crews inherit the scope instead of rediscovering it, and the whole rebuild bills to the claim file that opened on day one.
Opening balloon-framed walls also triggers code obligations that single-family playbooks skip. Modern Massachusetts code requires fireblocking in concealed spaces, and the open bays that spread the original loss get blocked while they are exposed, which makes the building safer than it was before the fire or flood. Egress gets the same treatment: the rear porch and stair system is the second means of egress for all three units, so when it burns or rots it is rebuilt to current guard, rail, and stair geometry requirements, not patched back to 1905. Likewise, any knob-and-tube found live in an opened cavity is flagged for licensed replacement before insulation goes anywhere near it.
Then there is the lead. Nearly all of this housing stock predates 1978, so disturbing painted surfaces falls under the EPA Renovation, Repair and Painting rule, which requires certified firms and lead-safe practices, containment, and cleaning verification. That matters double in a building where two of the three households may include children, and we run every triple-decker rebuild to it as a baseline, not an upgrade.
Buying or inheriting a triple-decker with old damage? We inspect the cavities, the sill, and the roof before you commit to a rehab budget, and we tell you plainly what is cosmetic and what is structural. The inspection is free: (781) 390-9855.
- Fireblocking added when cavities open
- EPA lead-safe certified work, pre-1978
- Trim and plaster matched across units
- Egress and detection brought to code
- One claim file, mitigation through rebuild
Boston Property Owners on Working With Studio 24
★★★★★
“From start to finish, Studio 24 handled everything. My roof and gutters were destroyed after a storm, and they worked directly with my adjuster to make sure nothing was missed. 10/10 service.”
James E., Randolph MA
★★★★★
“We had fire damage in our attic and thought the whole thing would be a nightmare. Ansy and his team showed up the next morning, walked us through everything, and got us approved for full restoration. True pros.”
Mark T., Mattapan MA
★★★★★
“They didn’t just replace our windows, they helped us get the entire job covered by insurance. You don’t meet many contractors this helpful and responsive anymore. Total peace of mind.”
Ron D., Roxbury MA
Three-Family Questions, Answered Straight
Triple Decker Restoration Questions Boston Owners Ask
Generally, the building owner’s policy covers the structure on every floor, each tenant’s renters policy covers that household’s belongings and displacement costs, and an owner-occupant’s own policy covers their unit’s contents. Policy language varies, so nothing here replaces reading yours. We document the loss unit by unit so every claim on the building has its own evidence.
Often not for the whole job. Contained water losses usually allow tenants to stay while drying equipment runs, and we sequence work to hand units back floor by floor. Units become uninhabitable when sewage, structural damage, or heavy smoke is involved, and in those cases displacement costs typically flow through the tenants’ renters policies and the owner’s loss-of-rents coverage.
Because balloon framing and the shared attic gave the smoke a direct path. Heated smoke rises through the continuous stud cavities and the common stairwell, then settles into plaster, fabrics, and contents far from the fire. That is real, claimable damage, and we test and treat every unit in the building rather than assuming distance kept yours clean.
Yes, on every one. Nearly all of Boston’s three-family stock predates 1978, so any work disturbing painted surfaces runs under the EPA Renovation, Repair and Painting rule: certified firm, containment, lead-safe practices, and cleaning verification. With multiple households in the building, often including children, we treat lead-safe work as the baseline for the entire project.
Because the water that stained the first-floor ceiling traveled through the second floor’s walls to get there. Continuous stud cavities carry moisture behind plaster that looks untouched, and unmetered saturation there becomes a mold problem and a coverage fight months later. Readings from the middle unit on day one are what keep its damage inside the original claim.
One last thing worth saying plainly. A triple-decker is the reason many Boston families own property at all, and a mishandled loss can turn the building from an income into a liability in one season. Restored correctly, documented across all three units, and rebuilt to match itself, the same building comes back stronger than it stood before the loss. That is the whole job as we see it, and it is why multi-family restoration services are a specialty here rather than a line item. Last updated August 2026.
Three Households Are Waiting on One Phone Call
Free inspection of all three units, every policy documented, and one team from extraction to the last piece of matched trim.